Precision insulation for turbines & turbomachinery
Removable high-temperature insulation for steam turbines, gas turbines, compressors and turboexpanders – for overhauls, monitoring and long-term operation.

Your specialist for
Turbines & turbomachinery.
Turbines are the heart of many industries – from power generation to the process industry. Miftari Dämm-Flex GmbH supplies removable turbine-casing insulation that provides maximum thermal insulation while allowing full access for inspections.

What we insulate in Turbines
for you.
Steam-turbine casings
Removable segmented insulation for the high-, intermediate- and low-pressure sections of steam turbines – with a numbering system for overhauls.
Gas turbines & casings
High-temperature insulation for gas-turbine casings, combustion chambers and exhaust lines – up to 650 °C.
Compressors & turboexpanders
Precisely fitting insulation mats for process-compressor casings and turboexpanders – cold and heat insulation.
Guide-vane & bearing areas
Special insulation for turbine bearings and guide-vane carrier areas with accessible measuring points.
Why Miftari
for Turbines?
Over 20 years of experience with the requirements of your industry — made to measure, installed without detours.
Overhaul system with numbering
Every insulation segment is numbered and catalogued – quick, error-free refitting after the inspection.
Compatible with online monitoring
Feed-throughs for thermocouple cables, vibration sensors and borescope ports are integrated into the insulation.
Up to 650 °C for gas turbines
Special ceramic-fibre insulation packs for the extreme temperatures on gas-turbine casings.
Thermal insulation improves efficiency
Correctly insulated turbine casings run more efficiently – a demonstrably measurable efficiency gain in part-load operation.
Four steps to perfect insulation.
Enquiry & consultation
Free advice on material, temperature and fastening system.
Measurement & planning
On-site measurement or production from your drawings.
Made to measure
Precise production in Leverkusen — every piece unique.
Delivery & installation
Europe-wide delivery, with initial installation on request.
Questions about insulation in Turbines.
We manufacture segmented insulation that divides the casing into individual, numbered sections. Each segment can be opened on its own – without touching the neighbouring segments.
Yes, all required measuring points are taken into account in the design phase and cleanly integrated into the insulation – sealed and durable.
Initial installation takes 1–5 days depending on turbine size. Refitting after an overhaul is much faster thanks to numbering and fit checks – often 50 % shorter.
Yes, we have experience with insulation for large gas turbines from Siemens Energy, GE and Ansaldo – on request.
Three steps to your quote.
Free and without obligation. You will hear back from our team within 24 hours.
What needs insulating?
Multiple selections possible.





